FUJI elevator installation stages:
1. Site study and design (3-7 days)
2. Blueprint approval
3. Shaft and infrastructure preparation (2-4 weeks)
4. Core equipment installation (1 week)
5. Operation and testing (3 days)
6. Handover and training